Step 6 The day itself, and the paperwork.
A straightforward board change is a single day. Power is off for most of it, and we will tell you the window in advance. Where you need a fridge or freezer kept alive we arrange a temporary supply rather than leaving you to improvise.
Before anything is disconnected we test the existing installation, because a board change means taking responsibility for what it is protecting. Then the new board goes in, every circuit is reconnected and identified, the earthing and main bonding are checked and corrected, and every circuit is tested through: continuity, insulation resistance, polarity, earth fault loop impedance and RCD trip times.
Certification, stated correctly
You receive an Electrical Installation Certificate with a full schedule of test results and a properly labelled board. That certificate is what a solicitor, an insurer or a letting agent asks for.
One correction worth making, because it appears on a lot of Scottish pages including some of ours previously. Scotland does not have a competent person scheme, and it does not have Building Control notification. Those are the England and Wales mechanisms, along with Part P, which does not apply here at all. In Scotland the framework is the Building (Scotland) Regulations and Building Standards, administered for Peterhead by Aberdeenshire Council. A building warrant is not required to replace a consumer unit in an existing house. What is always required is that the work complies with BS 7671 and is tested and certified, which is what the certificate above evidences.
If you let the property, two duties apply
The first is the familiar one: a satisfactory EICR at least every five years by a competent person, with a copy to your tenants.
The second is newer and widely misdescribed. Since 1 March 2024 the Repairing Standard has required one or more RCDs rated at no more than 30 mA in the main consumer unit, normally covering the socket outlet circuit as a minimum, with the exact protection depending on the installation. Worth being precise about what that does and does not mean, because a lot of pages overstate it:
- It does not require every circuit to be RCD protected. The wording is one or more devices in the main board, normally covering sockets as a minimum.
- It does not automatically fail a split load board. A dual RCD board has RCDs covering the socket circuits and will generally comply. If somebody tells you a compliant board now fails, ask them which paragraph they are relying on.
- What it does catch is a rented property with no RCD at all, which means rewireable fuses or breakers with nothing behind them. That is a genuine and common finding, and it is a real reason to replace the board.