AB10 to AB32 · Aberdeen City & Shire · NICEIC Approved

Consumer unit replacement in Aberdeen: what it costs, what the rules actually say, and whether you need one.

Fuse board, fuse box, consumer unit. Same thing, and it is the one piece of equipment in your home that decides what happens when something goes wrong. This page covers the whole decision: how to recognise what is on your wall, whether it genuinely needs replacing, what drives the price, what happens on the day, and what Scottish law does and does not require. Fully installed from £550 + VAT.

★★★★★
5.0 from 100+ Google reviews · NICEIC Approved Contractor · SELECT · BS 7671:2018+A4:2026
From £550+ VAT, fully installed
A4:2026Current wiring regulations
2391-52Inspection & testing
EIC issuedWith full test results
Aberdeen CityThe correct authority

What's on your wall, and does it matter?

Five generations, described by what you can actually see rather than by build date, because boards get changed and build dates mislead. Find yours and the rest of the page makes sense.

Replace

1. Rewireable fuses

What you see: a wooden or bakelite box with pull out carriers. Inside each, a strand of fuse wire between two screws. Often a cast iron main switch.

Protects against: overload and short circuit only. Nothing else.

What it means: no protection at all against current leaking to earth, which is the fault type that injures people. Frequently mounted on a wooden backboard, which is no longer acceptable for a new installation.

Replace

2. Cartridge fuses

What you see: similar carriers, but each holds a sealed cartridge rather than a strand of wire. Usually a metal or plastic enclosure.

Protects against: overload and short circuit, more reliably than fuse wire, and still nothing else.

What it means: the same gap as generation one. If nothing on the board has a test button, there is no earth fault protection anywhere.

Usually replace

3. Breakers, no RCD

What you see: a row of small switches you reset rather than replace. Nothing larger carrying a T or TEST button.

Protects against: overload and short circuit, conveniently. Still no earth fault protection.

What it means: a real gap. It also usually means the board predates the point where RCD protection became normal, so the rest of the installation is worth testing at the same time.

Often fine

4. Split load, one or two RCDs

What you see: breakers in two banks, each bank sitting behind a wider device with a test button.

Protects against: overload, short circuit and earth fault, with the earth fault protection shared across a group of circuits.

What it means: this is a compliant board and it is not a failure. The case for changing it is consequence rather than legality: one fault takes out every circuit behind that RCD. That matters more in some households than others.

Keep

5. Full RCBO, often with SPD

What you see: every circuit on its own device, each with its own test button. Often a wider board with an extra module at one end.

Protects against: overload, short circuit and earth fault circuit by circuit, plus transient overvoltage where a surge protection device is fitted.

What it means: current best practice. If this is what you have, you need an inspection at most, not a new board.

One thing to settle straight away, because a lot of quotes lean on it. A plastic enclosure is not retrospectively a fault. Regulation 421.1.201, which requires non combustible enclosures for domestic consumer units, governs what gets installed now. It does not make the board already on your wall illegal or non compliant. If a quote rests on that alone, ask which regulation and which date. For what each protective device actually covers, our protection coverage breakdown maps all five fault types against all six device types.

Do you actually need a replacement?

Five questions, in order. The first yes is your answer, and if you reach the end without one, you probably do not need this.

  1. Is there any scorching, a burning smell, buzzing, or a warm board?
    Then stop using it and get somebody out today. This is not a quote conversation, it is a safety one, and it is the only item on this list that is urgent.
  2. Is there any device on the board with a test button?
    If not, you have no earth fault protection anywhere in the property. That is the strongest and most common genuine reason to replace a board, and it covers generations one, two and three above.
  3. Has an EICR returned C1 or C2 findings that sit at the board itself?
    Then the board is the fix. If those findings sit on the circuits instead, a new board will not resolve them and may make them more visible. The report tells you which, and we will go through it with you.
  4. Are you adding significant load, and is the board full?
    A car charger, an electric shower, a heat pump, a garden office. If there are no spare ways and no capacity for the protection the new circuit needs, replacing the board is usually more sensible than bolting an enclosure alongside it.
  5. Does one fault take out half the house, and does that genuinely matter to you?
    On a split load board it will. Whether that justifies replacement depends on your household: a freezer, home working, someone who would struggle in the dark, or a property you let. This is a resilience decision rather than a compliance one, and it is perfectly reasonable to decide it is not worth it.

If you answered no to all five, you probably do not need a new consumer unit. An EICR from £150 + VAT will confirm it, and it costs a fraction of a board you did not need. We would rather tell you that than sell you one.

And the honest limit of what this job does: a new board protects circuits, it does not repair them. Fitted over cable with genuinely degraded insulation, a modern RCD or RCBO board does exactly what it was designed to do, detects the leakage the old board never noticed, and trips. Repeatedly. Which is why we test before quoting rather than after.

What it costs in Aberdeen, and what moves the number.

Drivers first, because a price only means something once you know what it is responding to. All prices exclude VAT.

The nine things that actually move the price

1. Way count

The board is priced by circuits. Every way is a device, a termination, a test and a line on the certificate. A four bedroom house with a shower, a hob and a garage is a different job from a one bedroom flat.

2. Earthing and main bonding

The most common chargeable extra by a distance. If main protective bonding to the incoming water and gas is missing or undersized it gets corrected, because the new board's protection depends on it. Common in older Aberdeen property and in tenement flats where services are shared.

3. Meter tails and supply arrangement

Short, undersized or brittle tails need replacing. The earthing arrangement the property has also affects the design, and on some supplies the board is arranged differently.

4. Where the board is

An accessible hall cupboard is straightforward. An external meter box, a shared stair, or a board a long way from the meter each add work. Our page on board position covers this properly.

5. Surge protection

£40 to £80 + VAT per device. The old calculation route was removed and the assessment is now based on the consequence of a surge. You can decline it, and that decision gets recorded.

6. Arc fault detection, where required

Adds meaningfully per circuit and is required only in specific premises, covered below. In an ordinary house it is recommended rather than required, and we will not quote it as a compliance item.

7. Relocation

Moving the board to a better position is a bigger job than replacing it where it stands, and sometimes involves your energy supplier as well, because the meter is theirs.

8. Making good

Usually minimal on a like for like swap. More where the board moves, tails are rerouted, or an old wooden backboard is replaced.

9. What testing finds

The genuine unknown. A board change means taking responsibility for every circuit behind it, so they all get tested. If a circuit fails you are told, with the reading, and it is quoted separately rather than quietly energised.

WorkPrice
Consumer unit replacement, typical domesticfrom £550, guide to £950 + VAT
Consumer unit and EV charger bundle£750 to £1,000 + VAT
Surge protection device, per device£40 to £80 + VAT
RCBO, per device plus install£25 to £30 + VAT
EICR, to establish condition firstfrom £150 + VAT
Hourly rate£55 to £75 + VAT
Earthing or main bonding correctionquoted after survey
Three phase or commercialquoted after inspection

What that includes, and what it does not

Included

  • The new consumer unit itself
  • All protective devices to suit the circuit count
  • Removing and disposing of the old board
  • Testing every existing circuit, before and after
  • Circuit identification and permanent labelling
  • An Electrical Installation Certificate with the full schedule of test results
  • NICEIC notification

Quoted separately

  • Earthing and main bonding corrections at the origin
  • Meter tail replacement where needed
  • Any existing circuit that fails its test
  • Relocating the board to a new position
  • Plaster and decoration beyond basic making good
  • Anything requiring your energy supplier or the network operator

This is the answer to wildly different quotes. A headline price and a considered quote are frequently pricing different scopes, and the gap is usually in the right hand column. Ask any quote you receive to state what it excludes, then compare like with like. If a quote does not mention testing, bonding or the certificate, those things are either not included or not being done.

Want a real number rather than a range? Tell us which board generation looks like yours and roughly how many circuits, and we can usually give you a close figure on the phone.

📞 Call 07304 027013

What happens on the day.

How long it takes. A straightforward like for like replacement on an accessible board with a modest circuit count is comfortably a half day. A larger board, an awkward position, bonding or tail work, or faults found once the cover is off, make it a full day. You get the expected duration at quote rather than an average, because the average is not your house.

  1. Test before anything is disconnected. Fitting a new board means taking responsibility for the circuits behind it, so we establish their condition while the old board is still in place. If something is going to fail, both of us want to know now.
  2. Isolate, and sort the essentials. Power off. Where a fridge or freezer needs to stay running we arrange a temporary supply rather than leaving you to run a lead from a neighbour.
  3. Old board out, new board mounted. Including replacing a wooden backboard where there is one.
  4. Every circuit reconnected and identified. Properly labelled, not a biro on a strip of tape.
  5. Earthing and main bonding checked and corrected. The commonest extra, flagged at survey wherever possible so it is not a surprise.
  6. Full testing. Continuity, insulation resistance, polarity, earth fault loop impedance, RCD trip times and prospective fault current, circuit by circuit.
  7. Energise, then hand over. Certificate, labelled board, and two minutes showing you which switch is which and how to test an RCD.

What to do before we arrive

Clear access to the board and roughly a metre in front of it. Decide what genuinely must stay powered so we can plan for it. If you work from home, say so in advance and we will agree a window. Note anything with a timer that will need resetting: heating, immersion, alarm panels, anything medical. Pets somewhere settled. That is genuinely all.

If we find something once the board is off

Sometimes a board cannot simply be swapped. A circuit with no earth, a borrowed neutral shared between circuits, an earthing arrangement that changes the design, or a circuit that fails its insulation test. Nothing gets charged or energised without telling you first. You get the finding, the reading behind it, the options and a price, and you decide. That conversation happening mid job is normal, and it is not a sales tactic.

Old fuse holders removed during a consumer unit replacement in Aberdeen
Completed RCBO consumer unit installed to BS 7671 in Aberdeen

The rules in Scotland, and three things you will read online that are wrong.

This matters more than it should, because much of what ranks for Aberdeen searches describes England and Wales. If a page tells you to notify Building Control, it was not written for your address.

Wrong

"Your electrician must comply with Part P."

Actually

Part P does not exist in Scotland. It is a part of the Building Regulations for England and Wales. It has no force here and never has.

Wrong

"A registered electrician self certifies the work to Building Control, otherwise you pay a notification fee."

Actually

Scotland has no competent person self certification scheme and no Building Control notification for this work. There is no notification fee to avoid, because there is no notification. The framework here is the Building (Scotland) Regulations and Building Standards, and for an Aberdeen address the authority is Aberdeen City Council. Your Electrical Installation Certificate is the document that evidences compliance.

Wrong

"The regulations changed, so your old board is now illegal."

Actually

BS 7671 is a standard, not a law, and it is not applied retrospectively. An older board in sound condition does not become illegal when the standard is updated. What changes is what must be installed now. The honest reasons to replace a board are in the decision flow above, and "the regs changed" is not one of them.

Where the standard actually stands, dated

The current version is BS 7671:2018+A4:2026, published on 15 April 2026. There is a six month transition, and from 15 October 2026 the previous version, BS 7671:2018+A2:2022+A3:2024, is withdrawn and A4 becomes the only current version. It is still the 18th Edition, and there is no 19th Edition.

Amendment 4's headline changes cover stationary battery storage, functional earthing and bonding for information and communication technology systems, Power over Ethernet, and medical locations. None of those forces a domestic consumer unit upgrade. Anyone using Amendment 4 as the reason you need a new board in an ordinary Aberdeen house is stretching it well past what it says.

Arc fault detection

Required on socket outlet circuits up to 32 A in higher risk residential buildings, houses in multiple occupation, purpose built student accommodation and care homes. Only recommended in an ordinary dwelling. That requirement arrived with Amendment 2 in 2022, not Amendment 4.

Surge protection

The old calculation route was removed in Amendment 2. The assessment is now based on the consequence of a surge, so it is fitted unless you decline it, and the decision is recorded. £40 to £80 + VAT.

Metal enclosures

Regulation 421.1.201 requires non combustible enclosures for domestic consumer units. It governs what is installed now and is not retrospective. Your existing plastic board is not a defect.

All RCBO boards

Not mandated. A dual RCD split load board remains compliant. Individual RCBOs are better because of what happens when a fault occurs, which is an argument about consequence rather than a legal requirement.

Last reviewed 29 July 2026. We re-check this section against the standard each quarter, and again before the 15 October 2026 changeover.

On building warrants: replacing a consumer unit in an existing house does not require one. A warrant is required for flats and maisonettes and for buildings of three storeys or more, and the duty to obtain it sits with whoever orders the work rather than the contractor. No warrant required never means no standard required, and certification applies either way.

If you are letting the property.

Two duties apply, and the second is the single most overstated claim in the trade right now. It is worth reading carefully, because getting it wrong costs landlords money they did not need to spend.

The five yearly EICR

Under the Repairing Standard, a private landlord needs a satisfactory Electrical Installation Condition Report at least every five years, carried out by a competent person, with a copy provided to tenants.

The RCD duty that started on 1 March 2024

This one is real, and it is routinely misdescribed. Here is what the statutory guidance actually says, quoted directly:

"there must be one or more Residual Current Device (RCD) with rated residual operating current not exceeding 30 mA in the main or principal consumer unit. Normally, as a minimum, this will cover the socket-outlet circuit. However, the protection requirements will vary depending on the installation in the let property."

Scottish Government, Repairing Standard statutory guidance for private landlords, Annex D3, paragraph D.55

What it does require

  • At least one RCD rated at no more than 30 mA in the main consumer unit
  • Normally covering the socket outlet circuit as a minimum
  • Protection appropriate to the particular installation

What it does not require

  • Not RCD protection on every circuit
  • Not an automatic failure for a working split load board, which has RCDs covering the socket circuits and generally complies
  • Not a full RCBO board as a condition of letting
  • No fixed remediation deadline exists in the guidance. C1 findings are acted on immediately and C2 findings require urgent remedial action, but no specific number of days is set anywhere

What the duty genuinely catches is a let property with no RCD protection at all, which means generations one, two and three in the identification section above. That is a common finding and a real reason to replace a board. If you have been told a working split load board now fails, ask which paragraph of the guidance that comes from.

The March 2024 changes went wider than electrics. The same package introduced duties on lead pipework, fixed heating, safely accessible food storage and preparation space, installations for fuels other than gas and electricity, access to common parts, and common doors, which matters in Aberdeen's tenement stock. More on our landlord electrician page.

If it is a licensed HMO, one thing genuinely does change

Aberdeen City Council licenses houses in multiple occupation under Part 5 of the Housing (Scotland) Act 2006, and the standard definition is three or more unrelated people sharing a kitchen or a bathroom. In a licensed HMO, arc fault detection devices are required on socket outlet circuits up to 32 A, where in an identical flat let to a single family they are only recommended.

Same flat, same wiring, different specification, decided purely by how it is let. It is one of the few places where the letting arrangement genuinely changes the board specification, and it is worth knowing before you buy or convert.

Managing more than one property? We work with Aberdeen landlords and agents on EICRs and remedial work across portfolios, and can schedule between tenancies.

📞 Call 07304 027013

Two things decided before we are: your supply, and where the board sits.

Both regularly change the job, and both have a page of their own because they deserve more room than a pillar can give them.

Your supply sets the ceiling

Where the supply enters the property there is a service cut out with a fuse in it, and that fuse caps what the whole property can draw. Common single phase ratings are 60A, 80A and 100A.

That cut out is not yours and not ours. It belongs to the distribution network operator, which in the north of Scotland is SSEN, and no electrician may lawfully change it. So when somebody asks for "a bigger fuse box", the board and the main fuse are two different things owned by two different parties. A new board does not increase what the network will give the property.

Supply capacity, load increases and who owns what →

Position changes the work

An accessible board beside the meter in a warm cupboard is the straightforward case, and it is the one price lists are written for. An external meter box on a weather facing wall, a board up a shared close two floors above the flat it feeds, or a board a long way from the meter each change the access, the specification and part of the price.

In tenement and flatted property the access question is frequently what delays a job, and it is worth resolving before booking rather than on the morning.

Where the board lives, and what each position changes →

The protective devices, one paragraph each.

Enough to follow a quote. The full picture of which device catches which fault is on the page linked below.

Fuse
A deliberate weak link that melts when too much current flows for too long. Protects against overload and short circuit. Cannot detect current leaking to earth, which is the fault that injures people.
MCB
A miniature circuit breaker. Does the same job as a fuse but resets with a switch rather than being replaced. Same blind spot: no earth fault protection.
RCD
A residual current device. Compares current flowing out against current returning and disconnects when the difference suggests current is escaping, through damaged insulation, water or a person. This is the life safety device, and it is what generations one to three do not have.
RCBO
One device combining MCB and RCD functions for a single circuit. The advantage is isolation: one fault takes out one circuit rather than everything sharing an RCD. Best practice, not a legal requirement.
AFDD
An arc fault detection device. Detects the signature of a persistent arc at a loose or damaged connection, which sits within normal current limits and is therefore invisible to everything above. Required in HMOs, higher risk residential buildings, purpose built student accommodation and care homes. Recommended elsewhere.
SPD
A surge protection device. Diverts brief high voltage spikes, from lightning on the network or switching events, away from your wiring and appliances. Increasingly standard on a new board and worth having in a house full of electronics.

Adding load: chargers, heat pumps, solar, batteries and showers.

This is how most consumer unit conversations start now. Somebody quotes for something else, and the board turns out to be in the way. Three questions decide it, in this order.

Are there spare ways? If the board is physically full, the new circuit has nowhere to go. Sometimes an adjacent enclosure is a legitimate answer, sometimes replacing the board is tidier and better value, particularly where the existing board is a generation three anyway.

Can the board provide the right protection? A car charger circuit has specific requirements, and older boards frequently cannot accommodate what a modern charger installation needs. That is a genuine technical constraint rather than an upsell, and any installer should be able to explain exactly which requirement their proposal satisfies.

Can the supply carry it? The question the board cannot answer, covered in the supply section above. Adding a charger, a heat pump and an electric shower is about simultaneous demand, not the board.

Doing the board and the charger together is usually cheaper than doing them separately, which is why the bundle exists at £750 to £1,000 + VAT. More on our EV charger page.

Eleven circuit consumer unit in a larger Aberdeen property

Consumer unit work across Aberdeen and the North East.

Across the city and out through Aberdeenshire. Worth knowing which authority covers you, because it is not always the one people assume: Cults, Kingswells, Peterculter, Countesswells, Bieldside, Milltimber, Dyce and Bridge of Don are Aberdeen City, while Ellon, Westhill, Peterhead, Fraserburgh and Maryculter are Aberdeenshire.

AB10AB11AB12AB13AB14AB15AB16AB21AB22AB23AB24AB25AB32

Related: EICR in Aberdeen · when a rewire is the answer instead · landlord electrical services · all Aberdeen areas

Steven Watt installing a new consumer unit in an Aberdeen home

Who does the work.

Steven Watt founded Faithful Spark Electricians and carries out or supervises the work himself. No subcontracted labour, and the person who quotes is the person who turns up.

  • NICEIC Approved Contractor. NICEIC assess our work and our certification as a condition of that approval, which is what an approval means in practice rather than a logo on a van.
  • SELECT member, the trade association for the Scottish electrical contracting industry.
  • City & Guilds 2391-52, inspection and testing, which is the qualification behind an EICR.
  • City & Guilds 2365-03 electrical installations, 2382-22 BS 7671 wiring regulations, and 2921-34 for electric vehicle charging equipment.
  • £2M public liability insurance.
  • Faithful Spark Electricians Ltd, a registered company, with over 100 Google reviews at 5.0.

Every one of those is publicly verifiable, and we would rather you checked than took our word for it.

Questions to ask anyone quoting you for a fuse board.

Print this, or read it down the phone. These are the eight that separate a considered quote from a number, and they are written for Scotland rather than borrowed from an English checklist.

  1. What does your price exclude? The most useful question on the list. Compare exclusions, not headlines.
  2. Are you testing the existing circuits before fitting the new board, and is that in the price? If not, nobody knows what the new board is being asked to protect.
  3. Is main earthing and protective bonding included, or extra if it is needed? The most common extra. Get the answer in advance.
  4. What certificate will I receive? The answer should be an Electrical Installation Certificate with a schedule of test results. If it is anything else, ask why.
  5. Which scheme are you registered with, and can I check it? Registration should be verifiable on the scheme's own register, not just a logo.
  6. Is surge protection included, excluded, or not recommended here, and why? A quote silent on surge protection is not a complete quote.
  7. Are you quoting arc fault detection, and is that because my property requires it? In an ordinary house it is recommended rather than required. Ask which applies to you.
  8. What happens, and what does it cost, if you find a problem once the board is off? Everyone finds things occasionally. What matters is how they handle it.

And one to be wary of in the other direction: if an electrician tells you the work will be notified to Building Control, that they will self certify under Part P, or that your board is illegal because the regulations changed, none of those is correct in Scotland. It does not necessarily mean the work will be poor, but it does mean the paperwork they are describing does not exist here.

Frequently asked questions.

Don't see yours? Call 07304 027013 or get in touch. We come back the same business day.

How much does a consumer unit replacement cost in Aberdeen?

From £550 + VAT, with a guide up to £950 + VAT depending on circuit count and complexity. The number is driven by way count first, then earthing and bonding, the state of the meter tails, where the board sits, whether surge protection is included, and what testing finds. The cost section above breaks all nine drivers down before it shows a price, because the price only means something alongside them.

What makes one quote £399 and another £700?

Almost always scope rather than greed. Ask both quotes what they exclude. A low headline frequently does not include testing the existing circuits, correcting main bonding, replacing tails, surge protection, or in some cases the certificate itself. A quote covering all of those looks more expensive and is often cheaper by the end. If a quote does not mention testing, bonding or the certificate, those things are either not included or not being done.

Do I actually have to replace my fuse box?

If you own and live in the property, there is no law requiring you to replace a board that is in sound condition. The honest reasons are in the decision flow above, and the strongest by far is having no RCD protection at all. If you let the property, the position is different and is covered in the landlord section.

I'm a landlord in Aberdeen. What does the law actually require?

An EICR at least every five years by a competent person, with a copy to tenants. And since 1 March 2024, one or more RCDs rated at no more than 30 mA in the main consumer unit, normally covering the socket outlet circuit as a minimum. It does not require every circuit to be RCD protected, and a working split load board generally complies. What it genuinely catches is a let property with no RCD protection at all.

Does a consumer unit replacement need to be notified to the council, or need a building warrant?

No to both, for an existing house. Scotland has no Part P, no Building Control notification for this work, and no competent person self certification scheme, because all three belong to England and Wales. The framework here is the Building (Scotland) Regulations, with Aberdeen City Council as the authority for Aberdeen addresses, and your Electrical Installation Certificate is the document that evidences compliance. A building warrant is required for flats and maisonettes and for buildings of three storeys or more.

How long does it take, and how long is my power off?

A straightforward like for like replacement on an accessible board with a modest circuit count is comfortably a half day. A larger board, an awkward position, bonding or tail work, or faults found once the cover is off make it a full day. Power is off for the bulk of the working time, and we give you the expected window at quote rather than an average. Where a fridge or freezer must stay running we arrange a temporary supply.

What happens on the day, and what do I need to do beforehand?

Clear access to the board and about a metre in front of it. Tell us what genuinely must stay powered, and tell us in advance if you work from home so we can agree a window. Note anything with a timer that will need resetting: heating, immersion, alarm panels, anything medical. Pets somewhere settled. The full stage by stage sequence is in the section above.

What if you find something wrong once the board is off?

You are told before anything is charged or energised. A circuit with no earth, a borrowed neutral, or a circuit that fails its insulation test are all things that occasionally turn up. You get the finding, the reading behind it, the options and a price, and you decide. Nothing that failed its test gets quietly reconnected.

What is the difference between a fuse, an MCB, an RCD and an RCBO?

A fuse and an MCB both protect against too much current, and neither can detect current leaking to earth. An RCD detects that leakage and is the life safety device. An RCBO combines both functions for a single circuit, so one fault takes out one circuit rather than everything behind a shared RCD. The devices section above covers all six device types, and our Ellon page maps each one against every fault type.

Why is surge protection on my quote?

Because the assessment changed. The old calculation route was removed, and the decision is now based on the consequence of a surge rather than a formula. For a house full of electronics, a home office or a heat pump it is usually worth the £40 to £80 + VAT. You can decline it, and that decision gets recorded on the certificate.

Do I need AFDDs?

In an ordinary house or flat, no. Arc fault detection is required on socket outlet circuits up to 32 A in higher risk residential buildings, houses in multiple occupation, purpose built student accommodation and care homes, and is only recommended elsewhere. If your property is a licensed HMO in Aberdeen, that requirement does apply to you. If it is a normal home and somebody is quoting AFDDs throughout as a compliance requirement, that is not correct.

Do I need a new board before an EV charger, heat pump, solar or battery?

Sometimes, and three questions decide it: whether there are spare ways, whether the board can provide the protection the new circuit needs, and whether the incoming supply can carry the extra demand. Older boards frequently cannot accommodate what a modern charger installation requires, which is a genuine technical constraint. Doing the board and the charger together costs £750 to £1,000 + VAT and is usually cheaper than doing them separately.

Which board will you fit, and does the brand matter?

We fit boards from the established UK manufacturers, chosen to suit the circuit count, the space available and the protection required. Every board we fit meets the current standard, so the brand matters far less than the design and the installation. If you have a preference, tell us and we will price it.

Will a new board fix my tripping, and will it affect my insurance or my house sale?

It depends why it trips. If several circuits share one RCD and normal appliance leakage accumulates, individual RCBOs will fix it. If a circuit has genuinely degraded insulation, a new board will detect that fault more decisively and the circuit still needs repairing. On insurance and sales, insurers and buyers' solicitors ask for evidence that the installation is safe and certified, and an Electrical Installation Certificate or a satisfactory EICR is what answers that. An old board on its own does not invalidate a policy, but an installation that has never been tested is harder to defend.

Book a consumer unit replacement in Aberdeen.

Call Steven directly on 07304 027013, message us on WhatsApp, or use the form. The two most useful things you can tell us are which of the five board generations above looks like yours, and roughly how many circuits it has. With those two answers we can usually give you a close figure on the phone rather than a range. And if the honest answer is that you do not need a new board, you will get that answer too. NICEIC Approved Contractor, SELECT member, City & Guilds 2365-03 installation and 2391-52 inspection and testing, £2M public liability insured.

Request a Quote

Faithful Spark Electricians Ltd · Consumer unit replacement across Aberdeen & Aberdeenshire · NICEIC Approved Contractor · SELECT Member · City & Guilds 2391-52, 2382-22, 2365-03, 2921-34 · BS 7671:2018+A4:2026 · £2M public liability insured