How much does a consumer unit replacement cost in Aberdeen?
From £550 + VAT, with a guide up to £950 + VAT depending on circuit count and complexity. The number is driven by way count first, then earthing and bonding, the state of the meter tails, where the board sits, whether surge protection is included, and what testing finds. The cost section above breaks all nine drivers down before it shows a price, because the price only means something alongside them.
What makes one quote £399 and another £700?
Almost always scope rather than greed. Ask both quotes what they exclude. A low headline frequently does not include testing the existing circuits, correcting main bonding, replacing tails, surge protection, or in some cases the certificate itself. A quote covering all of those looks more expensive and is often cheaper by the end. If a quote does not mention testing, bonding or the certificate, those things are either not included or not being done.
Do I actually have to replace my fuse box?
If you own and live in the property, there is no law requiring you to replace a board that is in sound condition. The honest reasons are in the decision flow above, and the strongest by far is having no RCD protection at all. If you let the property, the position is different and is covered in the landlord section.
I'm a landlord in Aberdeen. What does the law actually require?
An EICR at least every five years by a competent person, with a copy to tenants. And since 1 March 2024, one or more RCDs rated at no more than 30 mA in the main consumer unit, normally covering the socket outlet circuit as a minimum. It does not require every circuit to be RCD protected, and a working split load board generally complies. What it genuinely catches is a let property with no RCD protection at all.
Does a consumer unit replacement need to be notified to the council, or need a building warrant?
No to both, for an existing house. Scotland has no Part P, no Building Control notification for this work, and no competent person self certification scheme, because all three belong to England and Wales. The framework here is the Building (Scotland) Regulations, with Aberdeen City Council as the authority for Aberdeen addresses, and your Electrical Installation Certificate is the document that evidences compliance. A building warrant is required for flats and maisonettes and for buildings of three storeys or more.
How long does it take, and how long is my power off?
A straightforward like for like replacement on an accessible board with a modest circuit count is comfortably a half day. A larger board, an awkward position, bonding or tail work, or faults found once the cover is off make it a full day. Power is off for the bulk of the working time, and we give you the expected window at quote rather than an average. Where a fridge or freezer must stay running we arrange a temporary supply.
What happens on the day, and what do I need to do beforehand?
Clear access to the board and about a metre in front of it. Tell us what genuinely must stay powered, and tell us in advance if you work from home so we can agree a window. Note anything with a timer that will need resetting: heating, immersion, alarm panels, anything medical. Pets somewhere settled. The full stage by stage sequence is in the section above.
What if you find something wrong once the board is off?
You are told before anything is charged or energised. A circuit with no earth, a borrowed neutral, or a circuit that fails its insulation test are all things that occasionally turn up. You get the finding, the reading behind it, the options and a price, and you decide. Nothing that failed its test gets quietly reconnected.
What is the difference between a fuse, an MCB, an RCD and an RCBO?
A fuse and an MCB both protect against too much current, and neither can detect current leaking to earth. An RCD detects that leakage and is the life safety device. An RCBO combines both functions for a single circuit, so one fault takes out one circuit rather than everything behind a shared RCD. The devices section above covers all six device types, and our Ellon page maps each one against every fault type.
Why is surge protection on my quote?
Because the assessment changed. The old calculation route was removed, and the decision is now based on the consequence of a surge rather than a formula. For a house full of electronics, a home office or a heat pump it is usually worth the £40 to £80 + VAT. You can decline it, and that decision gets recorded on the certificate.
Do I need AFDDs?
In an ordinary house or flat, no. Arc fault detection is required on socket outlet circuits up to 32 A in higher risk residential buildings, houses in multiple occupation, purpose built student accommodation and care homes, and is only recommended elsewhere. If your property is a licensed HMO in Aberdeen, that requirement does apply to you. If it is a normal home and somebody is quoting AFDDs throughout as a compliance requirement, that is not correct.
Do I need a new board before an EV charger, heat pump, solar or battery?
Sometimes, and three questions decide it: whether there are spare ways, whether the board can provide the protection the new circuit needs, and whether the incoming supply can carry the extra demand. Older boards frequently cannot accommodate what a modern charger installation requires, which is a genuine technical constraint. Doing the board and the charger together costs £750 to £1,000 + VAT and is usually cheaper than doing them separately.
Which board will you fit, and does the brand matter?
We fit boards from the established UK manufacturers, chosen to suit the circuit count, the space available and the protection required. Every board we fit meets the current standard, so the brand matters far less than the design and the installation. If you have a preference, tell us and we will price it.
Will a new board fix my tripping, and will it affect my insurance or my house sale?
It depends why it trips. If several circuits share one RCD and normal appliance leakage accumulates, individual RCBOs will fix it. If a circuit has genuinely degraded insulation, a new board will detect that fault more decisively and the circuit still needs repairing. On insurance and sales, insurers and buyers' solicitors ask for evidence that the installation is safe and certified, and an Electrical Installation Certificate or a satisfactory EICR is what answers that. An old board on its own does not invalidate a policy, but an installation that has never been tested is harder to defend.