Commercial electrician in Aberdeen for offices, shops and industrial units
Commercial electrical contractors for Aberdeen businesses: installations, fit outs, three phase power, emergency lighting, testing and maintenance. Every job is a fixed price to a written scope after a free survey, commercial EICRs start at £300 + VAT, and the written quote usually follows within one working day. Call 07304 027013.
OZEV authorised installer EVHS/WCS14254. Steven Watt holds City and Guilds 2391-52 inspection and testing, 2382-22 BS 7671, 2365-03 installations and 2921-34 EV charging. Registered in Scotland SC821028.
What a commercial electrician in Aberdeen does
A commercial electrician installs, tests, maintains and repairs the electrical installation in business premises. That means the distribution boards and sub mains, lighting and small power, three phase supplies to plant and machinery, emergency lighting, and the certificates that prove all of it is safe. Faithful Spark Electricians does that work for Aberdeen businesses, from a single office floor to an industrial unit on one of the city's estates.
The difference from domestic work is scale and consequence. Commercial installations run bigger boards, often on three phase, and they carry duties under the Electricity at Work Regulations 1989 that a house does not. A shutdown also costs money, so the work is planned around trading rather than dropped into the middle of it.
We are a NICEIC Approved Contractor, enrolment 620239, registered in Scotland as SC821028, with our base at 17 Thomson Road, Peterhead, Aberdeenshire, Scotland, AB42 3FJ. Steven Watt leads the team, with Callum working alongside him, and the people who survey your premises are the people who do the work.
Commercial electrical services for Aberdeen businesses
Each service is quoted as a fixed price to a written scope. Where a service has its own page, the link takes you to the detail, the standards and the photographs.
Commercial EICR and fixed wire testing
Periodic inspection and testing of the whole fixed installation, coded and reported to BS 7671:2018+A4:2026, with any remedial work priced as a separate decision. Details on our commercial EICR page.
From £300 + VAT
Fit outs and refurbishments
Office, shop and hospitality refits from first fix to certification, sequenced around the other trades and your opening date. See electrical fit outs for Cat A and Cat B work.
Three phase supplies and distribution
New boards, sub mains, isolators and load balancing for workshops, kitchens and plant. Where the incoming supply has to change, we deal with SSEN for you. More on three phase installation.
Commercial lighting
LED panels for offices, high bay fittings for warehouses, and external lighting for yards and car parks, with the controls to match. See commercial LED lighting.
Planned maintenance
Scheduled inspections, remedials and fault finding on an agreed programme, so problems are found between EICRs rather than by a trip at opening time. See planned electrical maintenance.
Workplace EV charging
Staff, fleet and visitor chargepoints with load management, fitted by an OZEV authorised installer, reference EVHS/WCS14254. Read about workplace EV charging.
From £800 + VAT
Emergency lighting
Designed, installed, tested and certified to BS 5266: the monthly function test, the annual full duration test and a logbook that is up to date when somebody asks for it.
PAT testing
In service inspection and testing of the portable equipment you provide, on intervals set by risk, with every item recorded. NICEIC lists us for portable appliance testing.
Fault finding and repairs
Nuisance tripping, dead circuits, failed lighting and damaged accessories traced and repaired, with a certificate for the work and a note of anything else we found.
Tell us the premises and the job
Free survey anywhere in Aberdeen, then a fixed price in writing, usually within one working day.
Offices, shops, hospitality and the industrial estates
Aberdeen's commercial property splits into two quite different kinds of electrical job: the city centre and business park buildings where people work at desks and serve customers, and the estates where the electrics drive machinery. We work in both.
- Offices. Small power and lighting for desks that move, supplies to comms cabinets, emergency lighting on every escape route, and testing done before staff arrive.
- Shops, bars, restaurants and hotels. Commercial kitchens on three phase, extraction and refrigeration loads, display lighting, and shutdowns timed for when the doors are shut.
- Warehouses and workshops. Units at Altens, Tullos, Dyce, Kirkhill and Bridge of Don run compressors, welding sets, cranes and roller doors. Each needs its own protected circuit and isolation, and the board has to keep up when the tenant changes what the unit does.
- Landlords and managing agents. Landlord supplies and common parts, tenant changeovers, and a run of EICRs across a portfolio of units with the reports sent to whoever needs them.
Whatever the building, the first visit is a survey. We look at the supply, the boards and how the space is used, then write the scope and price it.

Recent commercial and industrial inspections in Aberdeen
These are boards from our own commercial and industrial EICRs in Aberdeen, published with the client's permission. They show what a commercial inspection actually looks at.




What we do with a finding. Every observation is coded on the report, and the remedial work is priced separately so you decide on it with the facts in front of you. Nothing is added to the bill on the day. If you want a board like the last one above looked at, call 07304 027013.
How much does a commercial electrician cost in Aberdeen?
We price commercial work as a fixed figure against a written scope, agreed before we start, rather than by the hour or the day.
Why we do not quote a day rate
Hourly and day rates are what you see quoted online for Aberdeen commercial electricians, but on their own they rarely tell you the total. A day rate says nothing about how many days, how many people, or what happens when a board turns out to need replacing.
A written scope fixes all three before anyone picks up a tool. If the work uncovers something the scope did not allow for, we stop, explain it and price it before carrying on.
Two prices we publish: commercial EICRs from £300 + VAT, priced on the number of boards and circuits, and workplace EV chargers from £800 + VAT.
What sets the price of a commercial job
- Boards and circuits. A compact unit with three boards can cost more to test than a large open store with one.
- Access. High bay ceilings, live production areas and plant rooms change how long the work takes.
- Timing. Phased shutdowns and work outside your trading hours are planned in, not added later.
- Materials and containment. Trunking, tray and armoured cable on a fit out are a large part of the price.
- Certification. An installation certificate, minor works certificate, EICR or emergency lighting certificate, depending on the job.
- Call or send the address. Tell us what the premises is used for and what needs doing.
- Free site survey. We look at the supply, the boards and the space, and agree when work can happen.
- Written scope and fixed price, usually within one working day of the survey.
- Work booked around your trading. Standard jobs are usually booked within 5 to 10 working days.
- Certificates issued for everything we install, alter or test, ready for your insurer, landlord or fire risk assessor.
Get a fixed price for your premises
Commercial EICRs from £300 + VAT and workplace EV chargers from £800 + VAT. Everything else is a fixed price to a written scope.
Who can do commercial electrical work in Scotland?
Anyone with the technical knowledge or experience to do the work without danger, or who is suitably supervised. That is the test in regulation 16 of the Electricity at Work Regulations 1989, which applies in Scotland as it does in England and Wales. There is no separate commercial electrician licence in the UK, so clients, insurers and main contractors look for evidence of that competence instead.
The duty holder is the business
Regulation 3 puts the duty on every employer and self employed person for matters within their control, and asks employees to cooperate. In practice that is the business owner, the facilities manager, or the landlord for the parts of a building the landlord keeps.
Appointing a competent contractor is how a duty holder meets that duty for the electrical work. Keeping the certificates is how they show it.
What to check before you appoint anyone
- A register entry with a certification body such as NICEIC, under the same company name and number as the quote.
- The right qualification for the task: 2391-52 for inspection and testing, 2921-34 for EV charging.
- Insurance you can see before work starts.
- Certificates named in the quote, so you know what paperwork you will have at the end.
Is an EICR a legal requirement for businesses in Scotland?
No law names the EICR or fixes an interval for business premises. Regulation 4(2) of the Electricity at Work Regulations 1989 does require every system to be maintained so as to prevent danger, so far as is reasonably practicable, and a periodic inspection and test is the accepted way to show you have done that.
- Intervals. IET guidance commonly puts offices and shops on a five year cycle and industrial premises on three, with shorter intervals where conditions are harsh.
- Insurers and leases. Many policies and commercial leases make a current report a condition. Their wording is often the deadline that actually binds you.
- Commercial lets. The lease sets out who maintains what. Landlords usually keep the common parts and the landlord's supply, and tenants the installation inside their unit.
- Reading the report. Under BS 7671:2018+A4:2026 only C1 and C2 make a report unsatisfactory. C3 and FI are advisory, and an FI (further investigation is advised) should still be looked at promptly.
- Part P does not apply in Scotland. It is a building regulation for England and Wales, and there is no Building Control notification here. Where work needs a building warrant, it comes from Aberdeen City Council for premises in the city or Aberdeenshire Council for the shire towns, and we tell you at survey.
We carry out commercial EICRs across Aberdeen from £300 + VAT, priced on boards and circuits, with remedials quoted separately. Call 07304 027013 to book one around your trading hours.


Emergency lighting to BS 5266, installed, tested and certified
Most business premises with escape routes need emergency lighting, and BS 5266 sets how it is tested: a short function test every month and a full rated duration test once a year, usually three hours, both recorded in a logbook.
The annual test is the one that gets skipped, and it is the one that finds batteries that no longer hold their charge. The other common problem is a layout that has moved on. Racking goes in, a partition moves or a mezzanine is added, and the fittings that lit the old escape route no longer light the new one.
We design and install emergency lighting on fit outs and refurbishments, take on the monthly and annual tests, and issue the certificate your fire risk assessment will ask to see. Ask for it on the same visit as your EICR and you get one survey and one fixed price.
Book your EICR and emergency lighting test together
One survey, one fixed price, and both certificates from a NICEIC Approved Contractor.
Commercial electrical work planned around your trading hours
We plan commercial work so the business keeps running. Testing and isolations are scheduled as phased shutdowns, early starts or Saturday morning work, agreed in writing before the job is booked rather than negotiated on the day.
- Safe isolation. Circuits are isolated and locked off one section at a time, so the rest of the building stays live.
- Testing in order. On an EICR we take the boards in an agreed sequence, starting with the areas you can spare first.
- Boards that fail gracefully. On new boards we recommend individual RCBO protection, so a fault drops one circuit rather than half the floor.
- One point of contact. Steven leads the team, with Callum working alongside him, and you deal with the people doing the work.
Office hours are Monday to Friday 8am to 6pm and Saturday 9am to 1pm. Call 07304 027013 to agree a window.

Commercial electricians across Aberdeen and Aberdeenshire
We cover commercial premises across the whole city, from the centre and the business parks to the estates at Altens, Tullos, Dyce, Kirkhill and Bridge of Don. Our base is in Peterhead, about 30 miles north, and the Aberdeenshire towns have their own commercial pages.
Peterhead
Our home town, with the harbour, processing units and the Dales and Blackhouse estates. See commercial electricians in Peterhead.
Ellon
Shops, offices and units along the A90 corridor north of the city. See commercial electricians in Ellon.
Fraserburgh
Harbour businesses, retail and workshops on the north coast. See commercial electrician in Fraserburgh.
Westhill
The business parks and energy sector offices west of the city. See commercial electricians in Westhill.
Looking for work at home rather than at the business? Our domestic team covers electricians in Aberdeen for EICRs, fuse boards, rewires and EV chargers.
Commercial electrician questions from Aberdeen businesses
If your question is not here, call 07304 027013 and ask it. We answer during office hours, Monday to Friday 8am to 6pm and Saturday 9am to 1pm.
What does a commercial electrician deal with?
A commercial electrician installs, tests, maintains and repairs the electrical installation in business premises. That covers distribution boards and sub mains, lighting and small power, three phase supplies to plant and machinery, emergency lighting, EV charging for staff and fleets, and the certificates that show it is all safe. We do all of this for offices, shops, hospitality venues, warehouses and workshops across Aberdeen.
Who can do commercial electrical work in Scotland?
Regulation 16 of the Electricity at Work Regulations 1989 says nobody should do electrical work where technical knowledge or experience is needed to prevent danger unless they have that knowledge or experience, or are suitably supervised. There is no separate commercial electrician licence, so clients and insurers look for evidence instead: registration with a certification body such as NICEIC, work to BS 7671:2018+A4:2026, certificates for every job and the right qualification for the task. We are NICEIC Approved Contractor 620239.
Is ECA the same as NICEIC?
No. They are separate organisations. The ECA (Electrical Contractors' Association) is a trade association for electrical contracting businesses. NICEIC is a certification body: it assesses a contractor's work against BS 7671 and lists the firms it certifies on a public register. Faithful Spark Electricians is a NICEIC Approved Contractor, enrolment 620239. We are not ECA members.
Is an EICR a legal requirement for businesses in Scotland?
No law names the EICR or fixes an interval for business premises. The Electricity at Work Regulations 1989 do require every electrical system to be maintained so as to prevent danger, so far as is reasonably practicable, and a periodic inspection and test is the accepted way to show you have done that. Insurers and commercial leases often make a current report a condition, so check both. Our commercial EICRs start at £300 + VAT.
How much does a commercial electrician cost in Aberdeen?
We price commercial work as a fixed figure against a written scope after a free site survey, rather than by the hour or the day. The two prices we publish are commercial EICRs from £300 + VAT and workplace EV chargers from £800 + VAT. Everything else depends on the number of boards and circuits, access, out of hours working and materials, so we survey first and confirm the price in writing, usually within one working day.
How often does emergency lighting need testing?
BS 5266 sets a short function test every month and a full rated duration test once a year, usually three hours, with both recorded in a logbook. We install, test and certify emergency lighting and can take on the monthly and annual tests.
Can you work around our trading hours?
Yes. Testing and isolations are planned as phased shutdowns, early starts or Saturday morning work, agreed in writing before the job is booked, so the business keeps trading while the work is done.
Do you do PAT testing for businesses?
Yes. NICEIC lists us for portable appliance testing. HSE guidance is that the frequency should depend on the risk, so office equipment is checked less often than tools used on a workshop floor. We record each item and can test it on the same visit as a commercial EICR.
Does Part P apply to commercial electrical work in Aberdeen?
No. Part P is a building regulation for England and Wales and has never applied in Scotland. Work here is covered by the Scottish building standards, and where a building warrant is needed it comes from Aberdeen City Council for premises in the city, or Aberdeenshire Council for the shire towns.
Are you based in Aberdeen?
Our base is 17 Thomson Road, Peterhead, about 30 miles north of the city, and we cover commercial premises across Aberdeen and Aberdeenshire. Surveys are free and every quote is a fixed price in writing.
Get a fixed price for your Aberdeen premises
Call 07304 027013 or use the form. Tell us the premises, what it is used for and the work you need, whether that is an EICR for your insurer, emergency lighting testing, a fit out or a new three phase board. We will arrange a free survey and send a fixed price in writing, usually within one working day.
Request a commercial quote
Faithful Spark Electricians Ltd, 17 Thomson Road, Peterhead, Aberdeenshire, Scotland, AB42 3FJ. Registered in Scotland SC821028. VAT 503 6560 13. NICEIC Approved Contractor 620239. TrustMark 4205123. OZEV EVHS/WCS14254. £2M public liability. Commercial prices exclude VAT and were correct at October 2026.