Fraserburgh AB43 · Houses, flats, shared closes and lets

Consumer unit replacement in Fraserburgh and fuse box upgrades from £550 + VAT

Changing an old fuse box in Fraserburgh for a modern consumer unit costs from £550 + VAT, with larger boards guided up to £950 + VAT. Our NICEIC approved team fits the board, tests every circuit and leaves you an Electrical Installation Certificate to BS 7671:2018+A4:2026, and most homes are done in a single working day. Call 07304 027013 or send two photos of the board for a fixed written price within one working day.

★★★★★ 5.0 from 100+ Google reviews · Monday to Friday 8am to 6pm, Saturday 9am to 1pm

A new consumer unit in Fraserburgh costs from £550 + VAT with Faithful Spark Electricians, and a bigger board with more circuits or awkward access is guided up to £950 + VAT. Fuse box, fuse board and consumer unit are three names for the same box, so a fuse box upgrade and a consumer unit replacement are the same job. The price covers the board, a test of your circuits before and after the change, labelling and the certificate. Where the board sits in a Fraserburgh home, beside the meter, in an outside box, up a shared close or a long way from the meter, is what moves the figure most.

Fuse box upgrade in Fraserburgh at a glance, checked 6 October 2026
Typical homeFrom £550 + VAT, guide up to £950 + VAT
Board and EV charger circuit together£750 to £1,000 + VAT
Surge protection device£40 to £80 + VAT per device
Extra RCBO£25 to £30 + VAT per device, plus fitting
Fixed written priceWithin one working day of your photos
On siteOne working day for most Fraserburgh homes
CertificateElectrical Installation Certificate with every test reading
Building warrantNot needed to replace a board with another of the same type
CouncilAberdeenshire Council for Fraserburgh and the villages
TravelNo surcharge for most addresses within about an hour of our Peterhead base, which takes in Fraserburgh
Consumer unit cost in Fraserburgh

What a fuse box upgrade costs in Fraserburgh

Every circuit on your board gets its own device, its own termination and its own line of test results, so the circuit count sets most of the price. All figures exclude VAT. For national price ranges by board type, read our guide to how much a fuse box upgrade costs.

Our Fraserburgh prices

Consumer unit, typical homefrom £550 + VAT
More circuits or harder accessup to about £950 + VAT
Board plus EV charger circuit£750 to £1,000 + VAT
Surge protection device£40 to £80 + VAT
Extra RCBO, plus fitting£25 to £30 + VAT
EICR on the whole installationfrom £150 + VAT

Old fuses to breakers

Moving from rewireable or cartridge fuses to a board of breakers is a full consumer unit replacement, so it is priced the same way: from £550 + VAT for a typical home. What can add to it on a fuse board is what sits around it. Fuse boards are often the oldest part of the house, so the main bonding to the water and gas pipes, the meter tails and the earthing at the origin are the extras we look at hardest before we give you a figure.

Get your fixed figure

Photograph the board with the cover closed and again with it open, add a photo of the meter area, and send them with your postcode. A fixed written price comes back within one working day. It only changes on the day if testing finds a fault, and you see the reading first.

Call 07304 027013

Why the board price is not the job price

Search for a consumer unit online and you will see boards listed from around £30 to £138 (Google UK shopping results, 6 October 2026). That is the box. A Fraserburgh fuse box upgrade is mostly what happens around the box:

  • Testing your existing circuits before anything is disconnected, so faults are found while the old board is still on the wall.
  • Safe isolation of a live supply, which starts at the sealed main fuse that belongs to SSEN.
  • Landing every circuit on the right device and checking earthing and main bonding at the origin.
  • Continuity, insulation resistance, polarity, earth fault loop impedance and RCD trip times on every circuit, with calibrated instruments.
  • An Electrical Installation Certificate with the full schedule of results, the paper a solicitor, buyer or letting agent can rely on.
  • A NICEIC Approved Contractor standing behind the work, with £2M public liability insurance.

The device count matters too. Check what a listed board actually includes, because a typical house may need eight or more RCBOs plus a surge protection device. We price the board your circuits need.

In the price

  • A new consumer unit with a protective device on each circuit
  • Testing of the existing circuits before the change
  • Every circuit labelled in plain words
  • A full test afterwards with each reading recorded
  • Your Electrical Installation Certificate

Priced separately after the survey

  • Earthing or main bonding corrections
  • New meter tails, or an isolator where the board is far from the meter
  • A circuit that fails its test
  • Moving the board, for example in from an outside box
  • Anything that needs SSEN or your energy supplier first

Book a fuse box upgrade in Fraserburgh

Two photos and a postcode are enough to start. Your fixed written price follows within one working day.

Fraserburgh homes

Where your board sits in Fraserburgh changes the job

Two identical boards can carry two different quotes because of where they are fixed. Four positions cover nearly every Fraserburgh property we are asked to price. Tell us which is yours when you send photos.

A

Indoors beside the meter

A hall cupboard, under the stair or a utility room, with the meter alongside. The tails are short and the space is dry. This is the job our from price describes, and it rarely needs anyone else involved.

B

In an outside box on the gable

Common on a lot of Fraserburgh housing, and the position that ages fastest with salt air coming off the sea. It changes the enclosure we fit, how every cable entry is sealed, and whether the board should stay outside at all. Often the better answer is to bring the board indoors and leave only the meter out there.

C

Up a shared close or stair

In flatted buildings the meters and boards can sit in the common stair, on a half landing or in a cupboard shared with neighbours. The electrics are rarely the hold up here. Access is, so we ask who holds the key when we quote.

D

A long way from the meter

Usually the legacy of an extension, a conversion or a kitchen that moved. Long tails may need replacing, an isolator may be needed near the meter, and if the meter position itself is the problem that is a matter for your energy supplier.

Boards in a shared close

  • Your board is your decision. The consumer unit feeding your flat is part of your installation, even when it sits in common space.
  • Shared parts are different. Stair lighting and any supply serving more than one flat belong to all the owners, usually through a factor. We tell you in writing which side of that line a finding falls on.
  • Neighbours may notice. Safe isolation can briefly affect a shared supply, so a note through doors the day before saves most of the friction.
  • Cold stairs mean condensation. An unheated close changes the enclosure and sealing we choose.

Specifying for sea air

Surface marks on the outside of a metal enclosure are cosmetic. Corrosion on the terminals or the busbar is a connection problem, and poor connections run hot, so that is what we open the board to check. In an exposed or unheated position we choose the enclosure for that exposure, seal every entry so water cannot track in along a cable, and record the terminal torque.

FuseBox F3011MZ consumer unit with RCBOs on each circuit, a surge protection device and a red 100A main switch
From one of our jobs. A FuseBox F3011MZ board we fitted, with an RCBO on each circuit, a surge protection device, a red main switch and spare ways left for future circuits.
Replace, or keep?

How often should a consumer unit be replaced?

There is no fixed replacement date. We know of no age in BS 7671 at which a sound board has to come out, so a consumer unit is replaced on its condition and on the protection it gives, not on its birthday.

The way to find out is an inspection. Electrical Safety First recommends a periodic inspection every 10 years in an owner occupied home and every 5 years in a rented one, and also before selling or buying a previously occupied home (Electrical Safety First, periodic inspection and testing). For a Fraserburgh rental, the five yearly report is a legal duty under the Repairing Standard rather than a recommendation.

Here is how we usually advise on the boards we open in Fraserburgh:

  • Rewireable or cartridge fuses, or a wooden backed board: replace. Fuses protect against overload but give no protection against an earth fault.
  • Breakers with no RCD anywhere: usually replace, for the same earth fault reason.
  • A split load board with one or two RCDs: compliant. Replace it for resilience or spare ways, not because a rule demands it.
  • An RCBO on every circuit: keep it and have it inspected.

Not sure which you have? An EICR in Fraserburgh from £150 + VAT gives you coded findings instead of opinions. Under BS 7671:2018+A4:2026 only a C1 or C2 makes the report unsatisfactory. C3 and FI are advisory, although an FI at the board deserves prompt follow up, particularly in a let.

Call the same day if you see this

  • Scorch marks or melted plastic on or around the board
  • A burning smell near the board
  • Buzzing or crackling from inside it
  • A board or switch that feels warm

Switch off at the main switch if it is safe to reach, and phone us.

Call 07304 027013

Has an EICR flagged your Fraserburgh board?

Send us the report. You get a straight answer on replace, repair or leave alone, with a fixed price for whatever is needed.

Main fuse or fuse box?

A fuse box upgrade and a main fuse upgrade are two different jobs

A fuse box upgrade replaces your consumer unit, which you own and we fit. A main fuse upgrade raises the size of the sealed fuse on the incoming supply, which belongs to the network operator and only they can change.

In Fraserburgh that operator is SSEN, the distribution network operator for the north of Scotland. SSEN says that if you want to increase your fuse capacity, for example from a 60 amp fuse to a 100 amp fuse, you request a Load Increase. If you are adding something that draws more power, such as a car charger or a heat pump, you request a Load Check. SSEN states that a load check is free, and that a small increase done on that visit is free too, while a larger one gets a quotation (SSEN load check).

So a new board leaves the supply exactly as it was. If you plan a charger, an electric shower and a heat pump, the real question may be the main fuse, not the board. We read the main fuse rating at survey and tell you before you spend anything.

Is there a free fuse box replacement through the government?

We know of no scheme, Scottish or UK, that pays for a consumer unit on its own. We checked the Home Energy Scotland funding page on 6 October 2026: its grants, loans and Warmer Homes Scotland support are for energy efficiency, such as insulation, heating, heat pumps and home renewables, not for electrical safety upgrades. If someone offers you a free board through a grant, ask them to name the scheme and check it with Home Energy Scotland before you sign anything.

Who owns what on your meter wall

  • SSEN: the sealed cut out and the main fuse inside it.
  • Your energy supplier: the meter, smart or not.
  • You: the meter tails, the consumer unit and every circuit after it. This is the part we replace.

If a job needs SSEN or your supplier first, you hear about it at the survey, not on the morning of the work.

Ask about your supply
The rules in Scotland

Can you replace your own consumer unit in Scotland?

You will not find a Scottish notification scheme to sign up to, because Part P is an England and Wales rule and does not apply here. What does apply is the building regulations, and they set a standard that a DIY board change is very hard to meet and prove.

Standard 4.5 and competence

Building regulations Standard 4.5 says an electrical installation must not threaten health and safety or become a source of fire. The Scottish Government's domestic Technical Handbook guidance says the installation should be designed, installed and tested in line with BS 7671, and that the work should be inspected and tested by people with sufficient technical knowledge, practical skills and experience for it.

No warrant, but no lower standard

Replacing a fitting with another of the same general type, including an electrical fixture, needs no building warrant under Schedule 3 of the Building (Scotland) Regulations 2004, on condition that the result is no worse than before. The owner is responsible for meeting the regulations, and Aberdeenshire Council is the building standards authority in Fraserburgh. Building Control notification is an England and Wales process and has no place here.

The certificate is the proof

The same guidance says BS 7671 certificates can be issued to the person ordering the work as evidence of compliance. A DIY change has no Electrical Installation Certificate with test readings behind it. Practically, safe isolation also starts at SSEN's sealed main fuse, and the testing needs calibrated instruments.

What about insurance?

We have found no official source saying DIY electrical work automatically voids home insurance, so we will not claim it. Read your own policy wording. What an insurer, a buyer or a letting agent can rely on after a board change is a certificate showing it was tested.

Can you sell a house in Fraserburgh with an old fuse box?

We know of nothing in the Scottish selling process that stops a sale because of an old board. What you do need is a Home Report: a property questionnaire you fill in, plus a single survey and an energy report prepared by a chartered surveyor, giving buyers information about the condition and value of the home (mygov.scot, selling a home). Buyers and their lenders read that survey. Electrical Safety First also recommends an inspection before a home is sold or bought, so if your board is old, an EICR before you list tells you where you stand. If the board does need replacing, keep the Electrical Installation Certificate with your documents for your solicitor.

Selling, letting or just unsure about your board?

Tell us what is driving the question. We will say whether you need a board, an inspection or neither.

On the day

How a Fraserburgh fuse box upgrade runs

A straightforward board change takes one working day, and your power is off for most of it. A shared close, an outside box or long tails add time, and we tell you at the survey so you can plan around it.

  1. 1

    Readings first

    We test the existing circuits with the old board still in place, because a new board means taking responsibility for everything behind it.

  2. 2

    Isolate

    Power off, and in a shared close the neighbours already know. Anything that cannot lose power should be mentioned when you book.

  3. 3

    Change over

    Old board out, new enclosure fixed and sealed for its position, each circuit landed on its own device. Bonding put right where the survey flagged it.

  4. 4

    Prove it

    Every circuit tested before it is switched back on. A circuit that fails stays off, and you are shown the reading.

  5. 5

    Hand over

    Your certificate, a labelled board, and a quick run through of the switches and the RCD test buttons.

Fraserburgh rewire with new circuit cables run down into a consumer unit cupboard, ready to be terminated
Fraserburgh rewire. New circuit cables run down into the consumer unit cupboard, ready to be terminated, with the tails and an isolator at the left.

When the board is not the whole answer

A new board protects circuits. It cannot mend them. On tired wiring a modern RCD trips on leakage the old fuses never noticed, which is why we test before we fix a price. Sometimes the honest recommendation is a rewire in Fraserburgh, in full or in part, with the new board fitted at the end of it, as on the job in the photo.

If the survey shows the board is sound and one circuit is the problem, we quote the circuit, not a board you do not need.

Amendment 4 and lets

What Amendment 4 and the letting rules mean for a Fraserburgh board

BS 7671:2018+A4:2026 was published on 15 April 2026 and is still the 18th Edition. Its headline changes cover battery storage, earthing for ICT systems, Power over Ethernet and medical locations. None of them forces a domestic board upgrade.

Claims we hear, and the rule

  • Plastic boards: regulation 421.1.201 asks for a non combustible enclosure on a board fitted in a home now. An existing plastic board is not a defect because of it.
  • AFDDs: required on socket circuits up to 32 A in HMOs, high rise residential blocks, purpose built student housing and care homes. Recommended, not required, in an ordinary house or flat.
  • Surge protection: in a single home the owner may decline an SPD, and the certificate records the choice.
  • All RCBO: not required. A dual RCD split load board remains compliant. We suggest RCBOs because one fault then drops one circuit.

Letting a flat or house in Fraserburgh

"there must be one or more Residual Current Device (RCD) with rated residual operating current not exceeding 30 mA in the main or principal consumer unit. Normally, as a minimum, this will cover the socket-outlet circuit."

Source: Repairing Standard statutory guidance, Annex D3, paragraph D.55.

A let with no RCD at all needs work. A split load board with RCDs over the sockets generally meets it, and nothing in the guidance asks for RCD protection on every circuit. A licensed HMO also needs AFDDs on its socket circuits, so it is priced on its own. We change boards between tenancies and work around your letting agent.

Adding a car charger

A new consumer unit and an EV charger in one visit

Many Fraserburgh board enquiries start with a car charger. Whether your board has to change depends on a spare way, the right protection for the charger circuit and enough supply for the extra load.

Sometimes a small separate unit feeds the charger and the main board stays. Where the main board is the weak point, doing both together costs less than two visits: the board and charger circuit pair is £750 to £1,000 + VAT. Our guide to a consumer unit upgrade for an EV charger explains how we decide, and our EV charger installation in Fraserburgh page covers the charger itself. SSEN's free load check, described above, has its own route for car chargers and heat pumps.

Who fits your board

Your Fraserburgh consumer unit team

We run Fraserburgh jobs from 17 Thomson Road in Peterhead. Our own team, led by Steven Watt with Callum working alongside him, fits your board. The work is not passed to a subcontractor.

We are a NICEIC Approved Contractor, enrolment 620239, TrustMark registered under 4205123, and insured for £2M public liability. Steven holds City and Guilds 2365-03 in electrical installations, 2382-22 in the BS 7671 wiring regulations and 2391-52 in inspection and testing, the award behind the readings on your certificate.

Need more than the board? The same team is your electrician in Fraserburgh for faults, sockets, lighting and new circuits.

Towns and villages we cover for board changes

  • Fraserburgh AB43
  • Rosehearty
  • Sandhaven
  • Pittulie
  • Inverallochy
  • Cairnbulg
  • St Combs
  • New Aberdour
  • Memsie
  • Strichen
  • New Pitsligo
  • Lonmay

Further inland, and for farms and rural homes with outbuildings on their own boards, see our consumer unit upgrade in Aberdeenshire page. Closer to our base, we also handle consumer unit replacement in Peterhead.

City and Guilds Level 3 Diploma 2365-03 in electrical installations, held by Steven Watt of Faithful Spark Electricians
2365-03 Level 3 electrical installations
City and Guilds Level 3 Award 2382-22 in the BS 7671 wiring regulations, held by Steven Watt of Faithful Spark Electricians
2382-22 BS 7671 wiring regulations
City and Guilds Level 3 Award 2391-52 in inspection and testing, held by Steven Watt of Faithful Spark Electricians
2391-52 Inspection and testing

Look us up on the NICEIC register before you book.

Google reviews

Rated 5.0 from more than 100 Google reviews

Read every review on our Google profile. One from a landlord we work for:

Peterhead · Partial rewire, rental
"I had Steven out to one of my rental properties in Peterhead to complete a partial rewire as part of a refurbishment. The service was outstanding and I will definitely have him back to complete my EICR’s in future."
Thomas Tsiolis Google review
Your questions

Fraserburgh consumer unit and fuse box questions

Not covered here? Call 07304 027013 or send us a message. We reply within one working day.

How much does it cost to fit a new consumer unit in Fraserburgh?

From £550 + VAT for a typical Fraserburgh home, guided up to about £950 + VAT for a larger board or harder access, such as an outside box or a shared close. A board and EV charger circuit together are £750 to £1,000 + VAT. Earthing or bonding corrections, new tails and a circuit that fails testing are priced separately after the survey.

How much does it cost to upgrade from fuses to breakers?

It is a full consumer unit replacement, so it starts at £550 + VAT for a typical home. Fuse boards are often the oldest part of an installation, so we check the main bonding, the meter tails and the earthing closely before fixing the price, because those are the extras most likely to apply.

Is there a free fuse box replacement through the government?

We know of no Scottish or UK scheme that pays for a consumer unit on its own. When we checked the Home Energy Scotland funding page on 6 October 2026, its grants and loans covered energy efficiency, such as insulation, heating, heat pumps and home renewables. If a free board is offered through a grant, ask which scheme is paying and check it with Home Energy Scotland.

Are main fuse upgrades free?

The main fuse belongs to SSEN, not to you or us. SSEN states that a load check is free and that a small increase done on that visit is free too, while a larger increase gets a quotation. That is separate from a consumer unit upgrade, which is the board on your side of the meter.

How often should a consumer unit be replaced?

There is no fixed interval. We know of no age in BS 7671 at which a sound board must be replaced, so it comes out on condition and protection. Electrical Safety First recommends an inspection every 10 years in an owner occupied home and every 5 years in a rented one, and that inspection tells you whether the board needs to go.

Can I replace my own consumer unit in Scotland?

Part P does not apply in Scotland, but building regulations Standard 4.5 does. The guidance expects the work to follow BS 7671 and to be inspected and tested by people with the right knowledge, skills and experience. Safe isolation starts at SSEN's sealed main fuse, the testing needs calibrated instruments, and without an Electrical Installation Certificate there is nothing to show the work was proved.

Can you sell a house with an old fuse box?

We know of nothing in the Scottish selling process that stops a sale because of an old board. You will need a Home Report, which includes a chartered surveyor's single survey on the condition of the home, and buyers read it. An EICR before you list tells you where the board stands, and if you replace it, keep the certificate for your solicitor.

My board is in an outside meter box. Can it be moved inside?

Often, and in Fraserburgh's sea air it is worth asking. Moving the board indoors and leaving only the meter outside takes the protective devices out of the weather. Whether it works depends on the wall and the route for the tails, so we confirm it at survey and price it separately.

My board is in the shared close. Do I need my neighbours' permission?

Not to replace the consumer unit that feeds your own flat, which is part of your installation. You do need access, so find out early who holds the key. Anything shared, such as stair lighting or a common supply, is a matter for all the owners, usually through the factor.

Does a consumer unit change in Fraserburgh need a building warrant?

Replacing a board with another of the same general type needs no building warrant under Schedule 3 of the Building (Scotland) Regulations 2004, provided the result is no worse than before. Aberdeenshire Council is the authority for wider work. Part P and Building Control notification are England and Wales rules and do not apply in Scotland.

How long does a fuse box upgrade take?

One working day for most Fraserburgh homes, with the power off for most of it. A shared close, an outside box, long tails or bonding work add time, and we tell you at the survey so freezers, heating and working from home can be planned around it.

Get your Fraserburgh consumer unit price

Call 07304 027013, message us on WhatsApp or use the form. The most useful things to send are two photos of the board, one of the meter area, your postcode, and whether it is a house or a flat on a shared stair. A fixed written price follows within one working day, and if you do not need a new board, we will tell you.

Monday to Friday8:00am to 6:00pm
Saturday9:00am to 1:00pm
SundayClosed
Based at17 Thomson Road, Peterhead, Aberdeenshire, Scotland, AB42 3FJ

Last updated 6 October 2026.

Request a consumer unit quote

Faithful Spark Electricians Ltd · 17 Thomson Road, Peterhead, Aberdeenshire, Scotland, AB42 3FJ · NICEIC Approved Contractor 620239 · TrustMark Registered 4205123 · City and Guilds 2365-03, 2382-22, 2391-52 · Boards installed to BS 7671:2018+A4:2026 · £2M public liability · Company SC821028 · VAT 503 6560 13