Outbuildings, steadings and sub-mains.
The rewire is the one moment when the extension lead that has been running the workshop for fifteen years gets replaced by something designed.
- Cable is sized for the run, not only the load. On a long sub-main it is voltage drop rather than current carrying capacity that sets the cable size. Get that wrong and you see it as voltage sagging under load, poor performance at the far end, and equipment misbehaving for no reason anyone can find.
- Armoured cable, buried properly. At the correct depth with warning tape above it, correctly glanded and terminated at both ends. Depth and marking are what stop a future fence post or drainage job becoming an emergency.
- A board in each building. A small consumer unit in the steading or workshop with its own protection, rather than a spur from the house that trips the house when something in the barn gets wet.
- A deliberate earthing decision for detached structures. Not an assumption carried over from the house. This is one of the commonest things we find done by default rather than by design.
Converted steadings and barn conversions are a rewire type of their own: big volumes, very long runs, masonry and timber in the same building, and frequently a conversion era installation now well into its third decade and never touched since.



