...
AB32 · Westhill, Elrick & Broadstraik · NICEIC 620239

Fitting battery storage to a Westhill house that already has an EV charger and a heat pump.

Battery storage across Westhill, Elrick and AB32, sized against your incoming supply. Free load and demand check before any quote. We set out to write a page arguing that a home battery lets a big Westhill house add an EV charger and a heat pump without a supply upgrade. Then we checked it properly, and it is not true. A battery cannot be counted in the calculation your electrician has to do, because a battery can be empty.

★★★★★
5.0 from 100+ Google reviews · NICEIC Approved · SELECT · BS 7671
AB32Westhill & Elrick
18.4kWAn 80A supply at 230V
FreeSSEN load check
722.311.201The regulation that counts
From £3,500Retrofit, 0% VAT
The Real Constraint

The constraint is the supply, not the roof.

Westhill is a town of large detached houses on single phase supplies, and their owners are steadily electrifying them. The question that decides whether an EV charger, a heat pump and an electric shower can coexist is not the size of the roof or the size of the battery. It is the rating of the fuse in the cut out and the maximum demand assessed against it.

At 230V a 100A cut out is about 23kW for the entire property, which matches SSEN's own published description of a maximum 23kVA capacity. Nothing downstream of that point can raise the ceiling. Not a bigger board, not more panels, and not a battery.

Across all ten pages competing for this search, the terms main fuse, service fuse, cut out, 60A, 80A, 100A, supply upgrade, maximum demand, diversity, peak import, load management, load curtailment and load shedding appear a combined total of zero times. SSEN is never named on any of them. So this page starts where they stop.

Electrician terminating conductors inside a distribution board during a domestic installation

Design, installation and certification by Steven Watt, City and Guilds Level 3 Award in the Design, Installation and Commissioning of Small Electrical Energy Storage Systems, with 2391-52 inspection and testing, under NICEIC enrolment 620239.

The Arithmetic

What everything in the house actually draws.

Simple sums at 230 volts, set against an 80 amp fuse. This is the arithmetic nobody selling batteries in this area will show you.

Indicative current demand at 230V, single phase

LoadCurrentBasis and note
7.4kW EV charger32ATaken at 100% with no diversity allowance
9.5kW electric shower41AArithmetic at 230V. An 8.5kW unit is about 37A, a 10.5kW about 46A
Air source heat pump11A to 23AWildly variable, and this is the interesting one. See the datasheet table below
Induction hob31A nameplateReal simultaneous draw is far lower and most hobs power manage
3kW immersion heater13AArithmetic at 230V
Whole supply, if the fuse is 80A80A18.4kW, for everything at once

The shower and the charger alone are 73 amps. A 9.5kW shower at roughly 41 amps plus a 32 amp charger is about 73 amps, on an 80 amp fuse, before anybody boils a kettle. Add a heat pump and you are over.

Composite view of the high demand appliances in a modern home, including an electric shower, an induction hob and an electric vehicle on charge

How these figures are arrived at

EV charge points are taken at 100% with no diversity under the recognised method, because chargers run at full output for hours. The shower, hob and immersion figures are simple arithmetic at 230V rather than cited manufacturer data, and are shown as such.

Maximum demand is the sum of connected loads multiplied by a diversity factor, and supply capacity must be verified against Reg 134.1.1 before load is added. The IET itself concedes that On Site Guide Appendix A allowances often produce conservative results exceeding actual installed demand, and that they are under review.

A heat pump is a datasheet question, not a kilowatt question

UnitQuoted figureMetric quoted
Vaillant aroTHERM plus 10kW (VWL 105/6, 230V)23.3ARated maximum current
Mitsubishi Ecodan 11.2kW (PUHZ-W112VHA, 230V)11.1ARunning current in heating at A7/W35

Those are different quoted metrics, maximum against running, so they are not a like for like comparison, and that is precisely the point. The heating output in kilowatts tells you almost nothing about the electrical demand. Whether your house has headroom depends on which specific unit goes in, which is a question for the datasheet at design stage, not for a brochure.

Both figures are the manufacturers' own published values, reproduced with the metric each of them chose to state: the Vaillant professional product page for the aroTHERM plus 10kW, and Mitsubishi Electric library data for the Ecodan PUHZ-W112VHA.

Maximum Demand

Whether a battery changes the assessment.

It lowers your bills and it flattens your typical evening peak. It does not lower the number your electrician has to write on the design.

Why stored energy cannot be credited

A flat battery has not failed.

Maximum demand is assessed on what the installation can draw, not on what it usually draws. A battery can be flat. And a flat battery has not failed, it is operating perfectly normally while importing at the full rate, which means it cannot satisfy the fail safe test that mitigation measures are held to. When a load limiting arrangement is not operating, the limits of the network operator's equipment still must not be exceeded. A battery at zero state of charge does not meet that.

We looked properly for a standard, a network operator position or IET guidance permitting stored energy to be credited against assessed demand, and found none. To be fair about it: we also found no explicit prohibition written down anywhere. The honest statement is that there is no recognised basis for crediting stored energy in a demand assessment, not that the wiring regulations forbid it.

What can be taken into account

BS 7671 Regulation 722.311.201.

BS 7671 has a provision for exactly this problem. Regulation 722.311.201, introduced by Amendment 1 in 2020, allows load curtailment, including load reduction or disconnection, applied automatically or manually, to be taken into account when determining the maximum demand of an installation.

That is the compliant route. A load curtailment or import limiting device measures what the house is drawing and throttles or drops the controllable load, typically the charger, before the main fuse is threatened. The network operator's process accepts such a scheme provided it fails safe, and it remains the installer's responsibility to state the maximum demand correctly, taking any curtailment scheme into account.

Regulation 722.311.201 is quoted in near identical terms by NAPIT and by the Regs. NAPIT gives the fuller citation, which is the one used throughout this page.

The one configuration that is defensible

A curtailment device that happens to have a battery attached.

Some hybrid battery systems include an energy management system that also enforces a hard import limit: it curtails the charger or the heat pump as measured import approaches the fuse rating, and it defaults to the safe limit when the battery is empty or the management system is dead.

That configuration is defensible, because it is a load curtailment device that happens to have a battery attached. The compliance comes from the curtailment function and its fail safe behaviour, not from the stored energy. If somebody tells you their battery solves your supply problem, that is the question to ask them: does it curtail, and what does it do when it is flat? Not one page competing for this search mentions load management at all, so it is unlikely you will be asked it.

A source adds, it does not subtract

Storage is another thing to accommodate.

The wiring regulations treat an additional source as something that adds current the installation must be able to carry, requiring common parts to be rated for what all sources could deliver simultaneously. Storage is not, in the eyes of the design process, a subtraction from your demand. It is another thing to accommodate.

SSEN's own wording places generators or storage assets under the same connection standards, which is why an existing solar notification cannot be assumed to cover added storage.

Source, paraphrased

The ENA EV Chargepoint and Heat Pump Combined Installation Process Flow Chart v1.3 requires that an import or load limiting device fail safe, meaning that when it is not operating or has failed, the limitations of the DNO service termination equipment must not be exceeded, and that it remains the installer's responsibility to ensure the stated maximum demand is correct, factoring in any curtailment scheme. That document could not be fetched directly, so this page paraphrases it and does not quote it.

Do not accept

Any claim that a battery, on its own, reduces assessed maximum demand. It does not. Ask instead for the curtailment function and its behaviour at zero state of charge, in writing. The charger's own notification and dynamic load balancing are dealt with separately, on EV chargers in Westhill. This page covers whole house maximum demand and the main fuse.

Your Network Operator

What more capacity actually costs in SSEN territory.

This is the part that removes the reason you may have come here, and we would rather you knew it than bought something.

Your network operator is SSEN. They publish that a load check is free, and they list an EV charging point or heat pump installation as a reason to ask for one. Their words:

"A load check is free of charge, and if we do need to increase your load and this is a small piece of work when we arrive, we will do this free of charge also."SSEN, load check page

And on capacity generally, again their words: increases are

"usually free of charge up to a maximum of 80amps for domestic customers or 100amps for small commercial customers (a max of 23kVA capacity)".SSEN, existing electricity connections

So for the great majority of Westhill houses, the answer to "can my supply take this?" starts with a free phone call to SSEN, not with a battery quote. If it turns out to need a specialist team or a large increase, they say they will send you a quotation instead. We are an electrical contractor telling you that the first step costs nothing and does not involve us. That is deliberate.

Both pages were retrieved directly on 23 August 2026. The arithmetic behind them is simple enough to check: 80A × 230V = 18.4kW, and 100A × 230V = 23kW, which matches SSEN's own maximum of 23kVA. We do not publish a price for a supply upgrade or for a single phase to three phase conversion, because SSEN does not publish one either; those are quoted per job.

Service head and cut out carrying a 60A main fuse next to the property consumer unit, showing a constrained incoming supply
The constrained case. A 60A cut out is roughly 13.8kW at 230V for the whole property, which a shower and a charger between them would exceed on their own. This is the supply where the free load check matters most.

The 60 amp threshold

Above 60A the recognised position is that the network operator's permission is required rather than notification within 28 days. That threshold, not the battery, is what governs whether you can simply proceed.

How a capacity change runs, using SSEN's own stated timescales

  1. Free load check. Ask SSEN. It costs nothing and may resolve the whole question on the doorstep. Free of charge
  2. If more is needed, apply online. The application itself is short. About 15 minutes to apply
  3. A quote follows. SSEN's own wording: "You'll hear from your quoter within 5 working days"
  4. Works are scheduled. SSEN's own wording: "We aim to begin works within 4 weeks; however, where legal land rights or council permits are required, works typically start within an average timeframe of 6-8 weeks."
A fuse replacement is not a route to more capacity

SSEN state plainly that when they replace a fuse holder "we will replace the fuse with an identical one - We will not increase the size of the fuse when replacing it." A faulty fuseholder callout is not a back door to a bigger supply. Capacity is a separate application.

The carrier marking is not the fuse

The rating printed on a carrier is not necessarily the fuse sitting inside it. Do not plan a system around what you can read in the cupboard. Ratings across GB network operators have historically included 60A, 80A and 100A, and several operators have moved to standardising on 80A because of exactly this wave of upgrade requests.

So What Is It For

What a battery is genuinely for.

Take the supply problem away from it and a battery still does three things well, and one thing people expect that it does not.

01

Retention of your own generation

Solar generates through the middle of the day. If the house is empty on weekdays, which describes a great many Westhill households commuting into Aberdeen or working at Arnhall, most of that goes to the grid for roughly half what you pay to buy it back. Storage is what stops that leak, and on a Westhill roof with a six to one summer to winter swing it is how you capture a short intense season.

02

Purchase of electricity when it is cheap

On a time of use tariff the battery fills overnight at the low rate and runs the house through the expensive evening. That works with no solar panels at all, which is the single most misunderstood fact about home storage. The catches are that you need the right tariff, and that the arithmetic only works if the spread between your day and night rates is wide enough to cover the round trip losses.

03

Continuity of essential circuits in a cut

Backup is possible but it is a specific design decision, not something every battery does by default. It needs a changeover arrangement and a defined set of circuits, and the cost depends on how much of the house you want covered. We will price it against your actual list rather than promise whole home backup on a page. Note that on the modern underground distribution serving most of Westhill, outage frequency is genuinely not the pain point it is on the exposed coast.

04

What it does not do

It does not give you more supply capacity in any sense a designer can rely on. It does not make a heat pump viable on a supply that could not otherwise take one. It does not run a large all electric house through winter on stored summer sunshine. And it does not remove the need for the free SSEN load check, which remains the first thing to do.

This page does not rehearse payback arithmetic. That is set out separately in whether battery storage is worth it in Scotland, and the combined case in solar and an EV charger fitted together.

Competence & Certification

Who is doing the work, and what they hold.

Qualifications held by Steven Watt, with the two storage and solar awards shown in full.

Held by Steven Watt

  • City and Guilds Level 3 Award in the Design, Installation and Commissioning of Small Electrical Energy Storage Systems (610/4840/9), awarded April 2026
  • City and Guilds Level 3 Award in the Installation and Maintenance of Small Solar Photovoltaic Systems (610/4841/0), awarded April 2026
  • City and Guilds 2391-52, inspection and testing
  • HNC Engineering Systems
  • NICEIC Approved Contractor, enrolment 620239
  • OZEV Authorised Installer, EVHS/WCS14254

We fit SolarEdge, Fox ESS, Alpha ESS and SolaX storage. Where a system needs to enforce an import limit as well as store energy, that capability is a specification question we settle at design stage rather than a badge on a brochure.

We are based in Peterhead and work across Westhill regularly. Saying so is better than implying otherwise. What we bring to an AB32 job is the analysis on this page, including the part where we talked you out of the thing we sell.

Anyone can claim qualifications. We will show you the certificates. Click either image to view the original document.

MCS

MCS registered through our Q-Smart partnership

Every installation we complete is fully MCS registered through our Q-Smart partnership. Q-Smart is a Competent Person Scheme. Faithful Spark Electricians carries out the installation and Q-Smart issues the MCS certificate, so your system qualifies for the Smart Export Guarantee, which is paid by your electricity supplier.

Standards

What the installation has to satisfy.

Across every page competing for this search, PAS 63100, BS 7671, Amendment 4, Chapter 57, G98 and the building warrant appear a combined total of zero times.

PAS 63100:2024

The 20kWh cap, clause 6.1.3

PAS 63100:2024 is the domestic battery standard, published 20 March 2024, and its full title tells you what it is about: protection against fire of battery energy storage systems for use in dwellings. Among its provisions, clause 6.1.3 caps the total energy stored within a single enclosure at 20 kilowatt hours. It also governs where a battery may and may not be sited, which is what determines whether the garage, the utility or the loft is actually available to you.

The full PAS text could not be read directly, so the 20kWh figure is stated rather than placed in quotation marks.

BS 7671

Amendment 4:2026 and the new Chapter 57

The installation is designed, tested and certified to BS 7671. Amendment 4:2026 was published on 15 April 2026 and is mandatory for new work from 15 October 2026, and it introduces a new Chapter 57 dealing specifically with stationary secondary battery installations. If you are specifying storage now, it should be specified to A4. More on Amendment 4.

This page states Regulation 722.311.201 as it stands and makes no claim about whether Amendment 4 altered or preserved Section 722.

G98 and G99

Through SSEN, and storage counts

SSEN put this plainly on their own micro generation page: G98 and G99 are the technical standards for the protection settings required for generators or storage assets to connect. Up to 3.68kW per phase the route is G98, connect then notify, with the form submitted within 28 days of commissioning. Above that and up to 50kW it is G99, applied for and approved before you install. If you already have solar and are adding storage, do not assume the existing G98 covers you; that is a question to settle before ordering equipment, and we settle it.

3.68kW = 16A × 230V.

Scotland

A building warrant, and no Part P

Part P is a section of the Building Regulations for England and Wales. Scotland has Building Standards, administered by the local council, and the mechanism is a building warrant. Fitting battery storage inside an existing dwelling is normally warrant exempt electrical work, though any structural or external alteration to house it is a separate question.

And although Westhill sits about seven miles west of Aberdeen, it is in Aberdeenshire Council, in the Garioch area.

One page ranking for battery storage in this town serves the identical text at both a Highland and an Aberdeenshire URL, which tells you it does not know which Westhill it is describing. Another scopes its own coverage to the AB10 to AB25 postcodes, which excludes AB32 entirely, and describes this inland commuter town as an exposed coastal community.

Method Of Work

How we run a Westhill storage job.

The order matters here more than usual, because step one may end the conversation and save you money.

  1. Establish your actual supply. What the fuse is, what the board is, and what is already connected. Where capacity is the live question we will point you at SSEN's free load check before quoting you anything.
  2. Maximum demand assessment. Connected loads with the recognised diversity treatment, EV charging at 100%, and the specific heat pump datasheet rather than its headline kilowatts.
  3. Decide what the battery is for. Self consumption, tariff arbitrage, backup, or a combination. This determines capacity and whether a hybrid or AC coupled design is right, and it is a different answer for a house that is empty all day.
  4. Siting against PAS 63100. Where the enclosure can legitimately go, the 20kWh per enclosure limit, ventilation, thermal conditions and separation. Settled at survey, not on install day.
  5. Written design and fixed price. Capacity, equipment, siting, any board work, and where relevant how import limiting is achieved and what it does when the battery is empty. In writing.
  6. Grid application to SSEN. G98 notification or a full G99 application, depending on total per phase capacity including any existing generation.
  7. Install, certify, hand over. Testing and certification to BS 7671, the MCS certificate issued by Q-Smart under our partnership, and the monitoring and tariff settings configured so the thing actually does what you bought it for.
Published Prices

Installed prices, Westhill and the Skene area.

All figures carry 0% VAT; there is nothing to add. Of the pages competing for this search, the longest runs to 2,783 words without a single price, a single brand or a single kilowatt hour figure.

Storage & Solar Schemes

SchemeInstalled priceDescription
Retrofit: battery added to existing solar, 5 to 10kWh£3,500 to £5,000AC coupled alongside your current inverter. The usual choice where panels went on years ago and the export is going out for a fraction of what you buy at.
4kWp solar with a 10kWh battery£10,000 to £12,000Designed together on a hybrid inverter, which is cheaper and tidier than adding storage a year later. Around 2,400 to 3,000 kWh a year of generation.
6kWp or more with 10kWh or more£12,000 to £15,000Westhill has the detached housing stock and the roof area to justify this, particularly where a heat pump or an electric car is already in the picture.

0% VAT applies to qualifying residential battery installations until at least 31 March 2027, and importantly it has applied to standalone batteries since 1 February 2024, so a retrofit to a house with existing panels qualifies in its own right. There is no VAT to add to any figure on this page. One competitor writes this as "until April 1st 2027", which reads as a deadline it is not.

Priced Separately

  • Consumer unit replacement: see consumer units in Westhill. A storage install often adds circuits that deserve a clean board.
  • EV charger: see EV chargers in Westhill, which covers the charger's own notification and load management separately.
  • Backup or emergency power supply: quoted against your actual circuit list rather than published as a headline figure.
  • Commercial storage: by survey, priced against your measured load profile.

Free Load Check First

Call SSEN and get your capacity established. Then call us about whether storage earns its place. That order costs you nothing and may end the conversation.

Call 07304 027013
Where We Cover

Westhill, Elrick and the Skene area.

We install battery storage across Westhill itself, Elrick and Broadstraik, and out through Skene, Kirkton of Skene, Garlogie, Dunecht, Echt, Kingsford, Wester Ord and Kingswells.

Westhill AB32ElrickBroadstraikSkeneKirkton of SkeneGarlogieDunechtEchtKingsfordWester OrdKingswells

Related Westhill pages: Solar Panels Westhill · EV Chargers Westhill · Consumer Units Westhill · Rewires Westhill · EICR Westhill · Electrician Westhill

Background reading: Solar PV & Battery Storage · whether battery storage is worth it in Scotland · solar and an EV charger fitted together · All Areas We Cover

FAQs

Questions put to us in Westhill.

Not listed? Phone and ask it. If the honest answer is that you do not need what we sell, that is what you will get. Call 07304 027013 or get in touch.

Will a battery let me add an EV charger and a heat pump without upgrading my supply?

No, not in any sense your electrician can rely on. Maximum demand is assessed on what the installation can draw, not what it usually draws, and a battery can be empty. A flat battery has not failed, it is operating normally while importing at full rate, so it cannot meet the fail safe condition that mitigation measures are held to, and there is no recognised basis for crediting stored energy in a demand assessment. What legitimately changes the assessment is a load curtailment device: BS 7671 Regulation 722.311.201 allows load reduction or disconnection to be taken into account when determining maximum demand. Some hybrid battery systems include exactly that function, and in that case the compliance comes from the curtailment, not the battery.

What does SSEN charge to increase my supply capacity?

Often nothing. SSEN publish that a load check is free of charge, that they will increase your load free of charge if it is a small piece of work when they arrive, and that increases are usually free of charge up to a maximum of 80 amps for domestic customers or 100 amps for small commercial, which is around 23kVA. If it needs a specialist team or a large increase, they send a quotation instead. We do not publish a figure for that, or for a single to three phase conversion, because SSEN do not publish one either; those are quoted per job. Before you buy anything, book the free load check.

How much power does an 80 amp main fuse actually give me?

About 18.4 kilowatts at 230 volts. A 100 amp fuse is around 23kW, which matches SSEN's own description of a maximum 23kVA. To put that in context: a 9.5kW electric shower is roughly 41 amps and a 7.4kW EV charger is 32 amps, so those two alone come to about 73 amps on an 80 amp fuse before anything else in the house is switched on. One caution, though. The rating printed on the carrier is not necessarily the fuse inside it, so do not design a system around what you can read in the cupboard.

How much electricity does a heat pump actually use?

It depends entirely on the specific unit, far more than on its heating output. A Vaillant aroTHERM plus 10kW single phase quotes a rated maximum current of 23.3 amps. A Mitsubishi Ecodan 11.2kW single phase quotes a running current of 11.1 amps in heating at A7/W35. Those are different quoted metrics, so it is not a like for like comparison, and that is the point: the kilowatt figure on the brochure tells you very little about the electrical demand. Whether your house has headroom is a datasheet question settled at design stage.

How much does battery storage cost in Westhill?

A battery retrofitted to existing solar, 5 to 10kWh, is £3,500 to £5,000 fully installed. Solar and a 10kWh battery designed together on a hybrid inverter is £10,000 to £12,000 for a 4kWp array, or £12,000 to £15,000 at 6kWp or above with 10kWh or more. All carry 0% VAT. Board work is priced separately, and backup is quoted against your actual circuit list rather than published as a headline number.

Do I pay VAT on a battery if I have no solar panels?

No. The 0% rate applies to qualifying residential battery installations until at least 31 March 2027, and it has applied to standalone batteries since 1 February 2024. So a battery fitted to a house with no panels at all, or retrofitted to a house whose panels went on years ago, qualifies in its own right. Be careful with the phrasing you will see elsewhere: one competitor writes "until April 1st 2027", which reads as a deadline it is not.

Is a battery worth it without solar panels?

It can be, and this is the most misunderstood fact about home storage. On a time of use tariff the battery charges overnight at the cheap rate and runs the house through the expensive evening, and no generation is involved. Two catches. You need to be on, and stay on, a tariff with a wide enough day to night spread, and the spread has to cover the round trip losses of charging and discharging. If either of those fails the arithmetic does not work, so ask to see it before you commit.

Do I need to tell SSEN about a battery?

Yes. SSEN state on their own pages that G98 and G99 are the technical standards for generators or storage assets. Up to 3.68kW per phase the route is G98, where you connect and then notify, with the form submitted within 28 days of commissioning. Above that and up to 50kW it is G99, applied for and approved before installation. If you already have solar and are adding storage, do not assume the existing arrangement covers you, and settle it before ordering equipment.

Where can a battery legally be installed in my house?

That is governed by PAS 63100:2024, the domestic standard published in March 2024 covering protection against fire of battery energy storage systems in dwellings. It sets out where an enclosure may and may not be sited, and clause 6.1.3 caps the total energy stored within a single enclosure at 20 kilowatt hours. In practice, in a Westhill house, the garage or a utility is usually the straightforward answer, but the siting question is settled at survey against the standard rather than assumed.

Will a battery keep my house running in a power cut?

Only if it is specifically designed to. Backup is not automatic; it needs a changeover arrangement and a defined set of circuits, and what it costs depends on how much of the house you want covered. Worth being realistic locally: most of Westhill is served by modern underground distribution, so outage frequency is not the pain point here that it is on the exposed coast. Several pages selling storage in this area lead on power cuts becoming more frequent. In a planned AB32 estate that is not the strongest reason to buy one.

Do I need a building warrant for battery storage?

Normally not for fitting storage inside an existing dwelling, which is usually warrant exempt electrical work. Any structural alteration or new external structure to house it is a separate question. Note that Scotland has Building Standards and building warrants rather than Part P, there is no Building Control body to notify, and for Westhill the authority is Aberdeenshire Council in the Garioch area, not Aberdeen City.

Is there a grant for battery storage in Scotland in 2026?

No. The Home Energy Scotland interest free loan for solar PV and battery storage closed to new applications in June 2024 and has not returned. ECO4 is a heating and insulation obligation aimed at benefit eligible households and does not fund battery storage for a typical owner occupier. What genuinely exists is 0% VAT until at least 31 March 2027, including on standalone batteries since February 2024, and Smart Export Guarantee income paid by your electricity supplier where you also have generation.

Book the free load check first.

Genuinely. Call SSEN, get your capacity established, and then call Steven on 07304 027013 to talk about whether storage earns its place. If the honest answer is that a load curtailment arrangement solves your problem and a battery does not, that is the answer you will get. NICEIC Approved Contractor, enrolment 620239. OZEV Authorised Installer. City and Guilds Level 3 Awards in Small Electrical Energy Storage Systems and Small Solar Photovoltaic Systems, plus 2391-52 inspection and testing and an HNC in Engineering Systems. Every installation fully MCS registered through our Q-Smart partnership. £2M public liability insured.

Request a Free Battery Survey

Faithful Spark Electricians Ltd · 17 Thomson Road, Peterhead, AB42 3FJ · 07304 027013 · Company registration SC821026 · NICEIC Approved Contractor, enrolment 620239 · OZEV Authorised Installer, EVHS/WCS14254 · SELECT Member · MCS registered through our Q-Smart partnership · BS 7671 18th Edition · PAS 63100:2024 · 0% VAT on qualifying residential battery installations until at least 31 March 2027 · £2M public liability insured